Detached ADUs, garage conversions, and home additions.

End-to-end design, permit, and construction. Built to be lived in, leased out, or to grow into.

What we do

More square footage, planned right.

An ADU or addition only works if the design, the permit path, and the build are all coordinated. We run all three under one contract.

California's ADU rules have created real options for South Bay homeowners. Detached ADUs, garage conversions, second-story additions, and footprint expansions are all scopes we take on, from feasibility through Certificate of Occupancy.

  • 6–9 mo Typical build time for detached ADU.
  • 9 mo Average permit-to-rent timeline on detached units.
  • 1 vendor Two crews. Construction & electrical under one roof.
Common scopes

What we typically build.

  • 01

    Detached ADUs

    400–1,200 sqft new ground-up units with full kitchens and baths.

  • 02

    Garage conversions

    Existing-footprint conversions for studio or 1-bed ADUs.

  • 03

    Home additions

    Footprint expansions, second-story additions, primary-suite adds.

  • 04

    Junior ADUs

    Within-existing-footprint units with kitchenette and bath.

By the numbers

ADUs built.
Tenants moved in.

  • 6–9 mo Typical build time for detached ADU.
  • 9 mo Average permit-to-rent timeline on detached units.
  • 1 vendor Two crews. Construction & electrical under one roof.
  • Same day Estimate response and walkthrough scheduling.
How we work

From first to final walkthrough.

  1. 01

    Feasibility

    Zoning, setbacks, sewer, utilities, and budget alignment up front.

  2. 02

    Design & permit

    Plans drawn, structural and Title-24, permits pulled.

  3. 03

    Build

    Foundation, framing, MEP, finishes, exterior, and landscaping ties.

  4. 04

    Final & rent-ready

    Inspections, walkthrough, certificate of occupancy.

Image gallery

A look at what's possible.

* Images marked with an asterisk are stock photography.

  • ADU build field photo
  • ADU build field photo
  • ADU build field photo
  • ADU build field photo

Ready when you are

Plan the
ADU.

Zoning, setbacks, utilities, and budget. We'll do the feasibility pass and tell you what's actually buildable on the lot.